NanJing Jinhui Heavy Duty Rack Warehouse Storage Pallet Racking Teardrop Heavy Duty Pallet Racking System Industrial Steel Structure
Widened Welding Land
With widened and thickened design, the contact area between the welding pad and the ground is large, which enhances the friction with the ground and is more stable.
Articulation Design
It adopts a new design, which is reasonably inserted into the kit on the beam, which is more convenient to disassemble and assemble, and the layer height can be adjusted at will.
Reinforcement Welding
After welding, the screws are reinforced, the connection between the shelves is more firm, and the goods are not afraid of falling off even if they are heavy.
The Beam is Stronger
Welding and rolling reinforced ribs can be welded under the beam to enhance its bearing capacity and make the beam difficult to deform.
Click Here To Contact Us→
Q1: Are you a factory or trading company?
A: We are a manufactory for storage rack.
Q2: Where is your factory located? How can I visit there?
A: Our factory is located in Nanjing City, Jiangsu Province, China. You can fly to Nanjing airport directly. We will pick you up at Nanjing International Airport. All our clients, from home or abroad, are warmly welcome to visit us.
Q3: What is the raw material of your products?
A: The material we choose is Q235 steel.
Q4: What is the packaging of the products?
A: Standard export package. All parts packed by steel belt and covered by plastic film.
Q5: What is the term of payment?
A: (1) T/T payment. (2) LC at sight.
Q6: Which port will be used as loading port?
A: Nanjing or Shanghai port.
Q7: What is your delivery time?
A: It depends on the order quantity and racking types, normally is 15 to 30 days after receipt of the deposit.
Q8: Are samples available?
A: Yes. Short sections of samples could be provided; they are free of charge, but international courier costs to be borne by clients.